Construction
Job Description | Measurement | Per | Rate (Rs) | Condition | |
---|---|---|---|---|---|
1 | Foundation | Cube | Per 1 Cube | 6500 | Without Material |
2 | Wall Build up | 1x1 | N/A | 125 | N/A |
3 | Block Stone | Per 1 | N/A | 35-40 | N/A |
4 | Engineering Stone | Per 1 | N/A | 65-70 | N/A |
5 | Wall Rough Finish | N/A | N/A | 40 | N/A |
6 | Wall Soft Finish | N/A | N/A | 45 | N/A |
7 | Floor Concrete | Sqft | Per | 40 | N/A |
8 | Floor Cement | Sqft | Per | 45 | N/A |
9 | Slab | Sqft | Per | 300-750 | N/A |